Project: Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method

PM Construction & Rehab, LLC – ITB: M/WBE & Section 3 Certified Firms

 

Project: Sanitary Sewer Rehabilitation WCID #5 Project

Project Location: Matagorda Co., TX

Bid Due Date: 11/16/2022

Quotes Returned: 11/11/2022


Scopes:

Pre & Post pipe burst Sanitary Sewer CCTV & Cleaning (562998)

  • 8” & 12” Diameter Sewer

Traffic Control (561990)

  • Turnkey Setup and operation of single lane closure with flaggers , 12 HR Shift

Material Suppliers (326199)

  • 8” & 12” HDPE Pipe
  • 4” PVC
  • Sewer Connection Saddles
  • 6” Ductile Iron Pipe

Manhole Rehabilitation (237110)

  • Manhole Rehabilitation
  • 24 EA

 


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624