PM Construction & Rehab, LLC – ITB: M/WBE & HUB Certified Firms
Project: WALKER-CALLOWAY BRANCH OUTFALL TRUNK SEWER SYSTEM PHASE 2 AND PHASE 3 IMPROVEMENTS
Project Location: Trinity River Authority
Bid Due Date: 03/21/2023
Quotes Returned: 03/16/2023
Scopes:
- Pre CIPP CCTV & Cleaning (562998)
- 33” Dai. San Sewer
- 42” Dia. San. Sewer
- 27” Dia. San. Sewer
- Open Cut Utility Repairs (238910)
- Point Repairs
- 42” & 27” Dia. Sewer
- Residential Water Line Adjustments
- FRP Manhole Install
- Ring & Cover Removal and replacement
- Decommission existing manholes
- Gabion Wall Install
- Removal of Concrete Slab in Creek Bed
- Install anchored concrete cover on exposed sewer under existing slab
- Weekly Street Cleaning
- Vertical Shoring
- Concrete Barrier with Fence on top
- Removal of asphalt & Steel plate install
- Steel plate removal and asphalt restoration
- Point Repairs
- Surveying (541370)
- Field-Verification, via Level A SUE, of the Exact Horizontal and Vertical Locations of Existing Pipes
- Landscaping (561730)
- St Augustine Sod Install
- Seeding per Acre
- Traffic Control (561990)
- Please quote Traffic control setups located on Pg 41 – 43 of plan set
- Bypass (237110)
- Turnkey setup and operation of bypass system for sanitary sewers being lined
- Pump Watch Rate
- Bypass plans provided in plan set
- Please include any trenching, boring, manhole install or surface restoration in bid
- Manhole Rehabilitation (237110)
- Approved Products
- 1. A.W. Chesterton:
- a. Primer: ARC 797.
- b. Top Coat: ARC 791, 250 mils minimum
- 2. Belzona:
- a. Conditioner: Belzona 4911
- b. Top Coat: Belzona 4111, Magma Quartz system, 250 mils minimum
- 1. A.W. Chesterton:
- Approved Products
Concrete and Asphalt Restorations (237310)
- Concrete Pavement R&R
- Asphalt Pavement R&R
- Concrete Trail R&R
Specs/Plans/Questions– Ashden Middlebrooks | [email protected] | 470-503-5624