PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Sanitary Sewer Rehabilitation 2025

Inliner Solutions – ITB: M/WBE Certified Firms

Project: Sanitary Sewer Rehabilitation 2025

Project Location: Greensboro, NC

Bid Due Date: 05/22/2025

Quotes Returned: 05/20/2025

Scopes:

  • Point Repair:
    • Dig and cut, Sewer Lines ranging from 6-18″ Lines, ranging from 0-20′ depth in low and high
  • CCTV/Cleaning:
    • CCTV/Cleaning pre/post sewer line rehab 4-24″ Diameter lines including laterals and main line sewer lines, in low and high traffic areas.
  • Open Cut/Bursting:
    • Burst and replace high and low traffic areas for lateral connections ranging from 4-5″ diameter and 0-12′ feet sections in depth.
    • Installations of new two-way cleanout and saddle taps for new and replace lateral connections.
    • Installation of New Manhole Structures Ranging in 4-5′ diameters, ranging in 8-12′ depths.
    • Correction of several MH Depths
    • Replacement of New manhole frame and cover assemblies
    • Location of manholes and uncovering.
    • Installation of outside drop on Manholes.
    • Remove and replace concrete flatwork on several sewer lines.
    • Installation of new DIP Sewer Lines 8″ diameters and 0-16′ depths in low and high traffic areas.
    • Internal Sewer lines repair cutting and trimming of line sections 4-8″ diameter in low and high traffic areas.
  • Manhole Rehab:
    • Application of cementitious and epoxy spray lining.
    • Fastening and sealing existing Manhole frame and covers.

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624