Inliner Solutions – ITB: M/WBE Certified Firms
Project: Sanitary Sewer Rehabilitation 2025
Project Location: Greensboro, NC
Bid Due Date: 05/22/2025
Quotes Returned: 05/20/2025
Scopes:
- Point Repair:
- Dig and cut, Sewer Lines ranging from 6-18″ Lines, ranging from 0-20′ depth in low and high
- CCTV/Cleaning:
- CCTV/Cleaning pre/post sewer line rehab 4-24″ Diameter lines including laterals and main line sewer lines, in low and high traffic areas.
- Open Cut/Bursting:
- Burst and replace high and low traffic areas for lateral connections ranging from 4-5″ diameter and 0-12′ feet sections in depth.
- Installations of new two-way cleanout and saddle taps for new and replace lateral connections.
- Installation of New Manhole Structures Ranging in 4-5′ diameters, ranging in 8-12′ depths.
- Correction of several MH Depths
- Replacement of New manhole frame and cover assemblies
- Location of manholes and uncovering.
- Installation of outside drop on Manholes.
- Remove and replace concrete flatwork on several sewer lines.
- Installation of new DIP Sewer Lines 8″ diameters and 0-16′ depths in low and high traffic areas.
- Internal Sewer lines repair cutting and trimming of line sections 4-8″ diameter in low and high traffic areas.
- Manhole Rehab:
- Application of cementitious and epoxy spray lining.
- Fastening and sealing existing Manhole frame and covers.
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624