Inliner Solutions – ITB: M/W/S/DBE Certified Firms
Project: Dublin Industrial Park Sewer Improvements & Rehabilitation
Project Location: Dublin, GA
Bid Due Date: 12/01/2023
Quotes Returned: 11/28/2023
Scopes:
- Open Cut Utility Repairs (238910)
- 18” Dia. Sewer Main Removal And Replacement
- 8” Dia. Sewer Main Removal And Replacement
- 18” Dia. Freebore
- 30” Dia. Steel Casing Jack & Bore
- Manhole Installation
- Material Suppliers (326199)
- HDPE Pipe & Fittings
- PVC Pipe & Fittings
- Pre cast Concrete Manholes
- Manhole R&C
- Erosion Control (561730)
- Silt Fence
- Check Dam
- Grassing
- Asphalt Restorations (237310)
- Class “A” Pavement Replacement
- Gravel Driveway Removal & Replacement
- Asphalt Driveway Removal & Replacement
- Manhole Rehab (237110)
- Raven 405, or Engineer approved equal.
- Traffic Control (561990)
- Single lane closure with Flaggers , 12 HR Shift
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624