PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: 2024-2025 Task Order Contract for Rehabilitation of Underground Corrugated Metal Pipe (CMP)

PM Construction and Rehab, LLC – ITB: S/M/WBE Certified Firms

Project: 2024-2025 Task Order Contract for Rehabilitation of Underground Corrugated Metal Pipe (CMP)

Project Location: San Antonio, Texas

Bid Due Date: 12/05/2023

Quotes Returned: 11/30/2023

Scopes:

Storm pip Invert Paving (237310)

  • For pipe Sizes 42” – 120”.

Spiral Wound PVC (326199)

  • For pipe sizes 12” – 48”.

Open Cut (238910)

  • Point repairs of pipe sizes 36” – 66” and greater.
  • Reconstruction and adjustment of existing manholes.
  • Concrete riprap.
  • Installation of Storm Sewer Junction Boxes.
  • Salvaging, hauling and stockpiling of asphalt pavement.
  • Concrete curb, sidewalk and driveway.
  • Storm pipe invert void filling.
  • Trench safety.

Paving (237310)

  • Prime and Tac coat.
  • Hot mix Type b and Type D.

CCTV (562998)

  • Heavy cleaning of lines.
  • Tv inspection of storm lines.

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624