PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Sanitary Sewer System – Asset Management Program – Contract No. 2023 AMP08 – Cleburn Ave Comprehensive Rehabilitation

Inliner Solutions – ITB: M/S/D/WBE Certified Firms

Project: Sanitary Sewer System – Asset Management Program – Contract No. 2023 AMP08 – Cleburn Ave Comprehensive Rehabilitation

Project Location: Birmingham, AL

Bid Due Date: 04/17/2024

Quotes Returned: 04/12/2024

Scopes:

  • Pre CIPP CCTV & Cleaning
    • 8” & 12” Dia.
    • Protruding tap removal
  • Lateral Rehabilitation
    • Full-Circle Main to Lateral Connection Lining
  • Open Cut Utility Repairs
    • Cleanout Install
    • Sewer Service connections
    • Sewer Service lateral replacement
    • Manhole Installation
    • Sewer Mainline Point Repairs
  • Manhole Rehabilitation
    • The internal liner system shall be a multilayered polyurethane/polymeric stress skin panel

system, a 100 percent solids epoxy or polyurethane coating, or a composite system

consisting of an epoxy or polyurethane top coat over a cementitious base coat


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts