Inliner Solutions – ITB: M/S/D/WBE Certified Firms
Project: Sanitary Sewer System – Asset Management Program – Contract No. 2023 AMP08 – Cleburn Ave Comprehensive Rehabilitation
Project Location: Birmingham, AL
Bid Due Date: 04/17/2024
Quotes Returned: 04/12/2024
Scopes:
- Pre CIPP CCTV & Cleaning
- 8” & 12” Dia.
- Protruding tap removal
- Lateral Rehabilitation
- Full-Circle Main to Lateral Connection Lining
- Open Cut Utility Repairs
- Cleanout Install
- Sewer Service connections
- Sewer Service lateral replacement
- Manhole Installation
- Sewer Mainline Point Repairs
- Manhole Rehabilitation
- The internal liner system shall be a multilayered polyurethane/polymeric stress skin panel
system, a 100 percent solids epoxy or polyurethane coating, or a composite system
consisting of an epoxy or polyurethane top coat over a cementitious base coat
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624