PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: FY22 Sewer Rehabilitation

Inliner Solutions – ITB: MBE Certified Firms

Project: FY22 Sewer Rehabilitation

Project Location: Cary, NC

Bid Due Date: 06/25/2024

Quotes Returned: 06/28/2024

Scopes:

  • Pre CIPP CCTV & Cleaning (562998)
    • 8” – 42” Dia. Sanitary Sewer
  • Open cut Utility Repairs (238910)
    • Sanitary Sewer Point Repairs: 8” – 12” Dia.
    • Replace manhole Frame & Cover
    • Remove and replace Precast Flat Top
    • 8” Force Main removal and replacement
  • Manhole Rehabilitation (237110)
    • High Performance by Strong Seal
    • Sewpercoat PG by Kerneos
    • Mainstay ML-PF by Madewell
    • Cemtec HITECH 100 by A.W. Cook Cement
    • Maximum CA plus Cement by Standard Cement Materials
  • Bypass Pumping (237110)
    • SEWER BYPASS FOR AREA UPSTREAM OF AVIATION PARKWAY FOR THE 36″ AND 42″ BRIER CREEK INTERCEPTOR (PRIMARILY SHEET C-1)
    • SEWER BYPASS FOR AREA DOWNSTREAM OF AVIATION PARKWAY FOR THE 42″ BRIER CREEK INTERCEPTOR (PRIMARILY SHEET C-2)
    • SEWER BYPASS FOR THE LONG BRANCH AREA (ALL WORK SHOWN ON SHEET C-4)
    • SEWER BYPASS AND PUMP AND HAUL OPERATIONS FOR THE CARY TOWNE BLVD. AREA (ALL WORK SHOWN ON SHEET C-5)
  • Landscaping (561730)
    • Tree Removal
  • Concrete & Asphalt Restorations (237310)
  • Erosion Control (561730)

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624