Project: FY22 Sewer Rehabilitation
Project Location: Cary, NC
Bid Due Date: 06/25/2024
Quotes Returned: 06/28/2024
Scopes:
- Pre CIPP CCTV & Cleaning (562998)
- 8” – 42” Dia. Sanitary Sewer
- Open cut Utility Repairs (238910)
- Sanitary Sewer Point Repairs: 8” – 12” Dia.
- Replace manhole Frame & Cover
- Remove and replace Precast Flat Top
- 8” Force Main removal and replacement
- Manhole Rehabilitation (237110)
- High Performance by Strong Seal
- Sewpercoat PG by Kerneos
- Mainstay ML-PF by Madewell
- Cemtec HITECH 100 by A.W. Cook Cement
- Maximum CA plus Cement by Standard Cement Materials
- Bypass Pumping (237110)
- SEWER BYPASS FOR AREA UPSTREAM OF AVIATION PARKWAY FOR THE 36″ AND 42″ BRIER CREEK INTERCEPTOR (PRIMARILY SHEET C-1)
- SEWER BYPASS FOR AREA DOWNSTREAM OF AVIATION PARKWAY FOR THE 42″ BRIER CREEK INTERCEPTOR (PRIMARILY SHEET C-2)
- SEWER BYPASS FOR THE LONG BRANCH AREA (ALL WORK SHOWN ON SHEET C-4)
- SEWER BYPASS AND PUMP AND HAUL OPERATIONS FOR THE CARY TOWNE BLVD. AREA (ALL WORK SHOWN ON SHEET C-5)
- Landscaping (561730)
- Tree Removal
- Concrete & Asphalt Restorations (237310)
- Erosion Control (561730)
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624