Project: Sanitary Sewer Rehabilitation

Inliner Solutions – ITB: M/S/WBE Certified Firms

Project: Sanitary Sewer Rehabilitation

Project Location: Cordele, GA

Bid Due Date: 08/20/2024

Quotes Returned: 08/15/2024

Scopes:

  • Pre CIPP CCTV & Cleaning , Sanitary Sewer (562998)
  • 6 – 18 Inch Dia. Sewer
  • Protruding tap removal
  • Manhole Rehabilitation (237110)
    • Structural Manhole Rehab Lining & vacuum Testing
      • SewperCoat as manufactured by Kernos Aluminate Technologies or
      • Strong-Seal High Performance as manufactured by The Strong Company
    • Reconstruct Manhole Invert
  • Open Cut Utility Repairs (238910)
    • Remove & Replace Sanitary Sewer Main
      • 6” – 18” Dia.
    • Remove & Replace sanitary sewer service line
    • Cleanout Install
    • Sanitary Sewer Point Repairs
    • Manhole Install
    • Manhole Frame & Covers
    • Raise Manhole
    • Remove existing manhole cone & Chimney & Rebuild barrel
    • Construction Exit
    • Asphalt Replacement
    • Construction Matting
    • Silet Fence Install
  • Bypass Pumping (237110)
    • Turnkey bypass setup and operation for 15” & 18” CIPP
  • Traffic Control (561990)
  • Turnkey Setup & Operation of Single lane closure with Flaggers , 12HR Shift

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624