Project: Perch Creek Area Sanitary Sewer Trunk Line CIPP Phase 1
Project Location: Mobile, AL
Bid Due Date: 09/11/2023
Quotes Returned: 9/06/2023
Scopes:
- Pre CIPP CCTV & Cleaning San. Sewer (562998)
- 18” – 48” Dia.
- Manhole Rehabilitation (237110)
- Approved Products
- StrongLite Products Corporation and designated STRONG-SEAL MS-2C
- Southwestern and designated Permacast MS- I 0,000
- Approved equal
- Or a proprietary-formulated, urethane-based material specifically designed for
- Approved Products
- manhole applications as manufactured by Sprayroq, Inc. and designated Spray
- Wall or approved equal.
- Open Cut Utility Repairs (238910)
- Replace MH F&C
- Raise MH