PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: E. Broad & S. Main Streets Sewer Upgrade

Inliner Solutions, LLC – ITB: D/M/S/WBE & Section 3 Certified Firms

Project: E. Broad & S. Main Streets Sewer Upgrade

Project Location: Darlington, SC

Bid Due Date: 09/07/2023

Quotes Returned: 09/04/2023

Scopes:

  • Pre & Post Pipe Burst CCTV – Sanitary Sewer (562998)
    • 10”, 15” & 18” Dia.
  • Manhole Rehabilitation (237110)
    • Grout Sealant product requirements can be found on Pg 116 of the specifications book
  • Traffic Control (561990)
    • Turnkey setup and operation of Single lane closure along E Main St in Darlington
    • Detour Signage & barricade setup for E Broad Street in Darlington
  • Asphalt Repairs (237310)
    • 2” Asphalt Patching
    • 2” Asphalt Overlay
  • Bypass (237110)
    • Turnkey bypass setup and operation for sewer flows on 15” & 18” Dia. Sewers being rehabilitated
  • Material Suppliers (326199)
    • 10” IPS SDR17 HDPE
    • 15” IPS SDR17 HDPE
    • 18” IPS SDR17 HDPE
    • PVC Pipe & Fittings
    • PVC Pipe & Fittings

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624