Project: Marco Estates Sewerage System Improvements
Project Location: Social Circle, GA
Bid Due Date: 07/13/2023
Quotes Returned: 07/10/2023
Scopes:
- Pre & Post Pipe Burst Mainline Sewer CCTV & Cleaning (8- Inch) (562998)
- Pre Video Service Line Sewer (4 – 6 Inch) (512191)
- Manhole Rehabilitation (237110)
- Manhole Rehabilitation Class B: Brick manholes and/or damaged pre-cast manholes with heavy aggregate exposed in low to moderate H2S exposure will require the application of a minimum 1″, 100% calcium aluminate cementitious lining provided by SewperCoat, Strong Seal, or approved equal .
- Material Suppliers (326199)
- HDPE Pipe
- Sewer Lateral Saddles
- PVC Pipe & Fittings
- Precast Manholes
- Manhole R&C
- Cleanout Assembly (Including Meter Box)
- Asphalt & Concrete Repairs (237310)
- Asphalt Overlay
- 6” Concrete Replacement
- Erosion Control (561730)
- Grassing
- Mulching
- Silt Fence
Specs/Plans /Questions– Ashden Middlebrooks | ashden.middlebrooks@puriscorp.com | 470-503-5624