Inliner Solutions – ITB: M/WBE & Section 3 Certified Firms
Project: FY2022 CDBG Sewerage System Improvements
Project Location: Glennville, GA
Bid Due Date: 09/21/2023
Quotes Returned: 09/18/2023
Scopes:
- Pre CIPP CCTV & Cleaning , San. Sewer (562998)
- Root & Grease Removal
- Grit Removal
- Protruding Tap Removal
- Material Suppliers (326199)
- PVC Pipe & Fittings
- DI Pipe & Fittings
- Precast Manholes
- Manhole F&C
- Open Cut Utility Repair (238910)
- Point Repairs
- Mainline Sewer removal & Replacement
- External San. Sewer service reconnections
- Cleanout Install
- Manhole Rehabilitation (237110)
- Manhole Rehabilitation Class C:
- Brick and/or pre-cast manholes exhibiting serious corrosion in a harsh H2S environment will require the application of l “,100% calcium aluminate cementitious lining or micro silica lining. The lining shall be top coated with 100 mils of 100% solids epoxy as manufactured by Quadex, Inc., Madewell Products Corporation, Raven, Tnemec EpoxyTec or approved equal
- Manhole Rehabilitation Class C:
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624