Inliner Solutions – ITB: M/WBE Certified Firms
Project: Sanitary Sewer System – Asset Management Program – Contract No. 2023 AMP07 – Collegeville Comprehensive Rehabilitation
Project Location: Jefferson Co., AL
Bid Due Date: 09/20/2023
Quotes Returned: 09/15/2023
Scopes:
- Pre CIPP CCTV & Cleaning
- 8” & 12” Dia.
- Protruding tap removal
- Lateral Rehabilitation
- Full-Circle Main to Lateral Connection Lining
- Open Cut Utility Repairs
- Cleanout Install
- Sewer Service connections
- Sewer Service lateral replacement
- Manhole Installation
- Sewer Mainline Point Repairs
- Manhole Rehabilitation
- The internal liner system shall be a multilayered polyurethane/polymeric stress skin panel system, a 100 percent solids epoxy or polyurethane coating, or a composite system consisting of an epoxy or polyurethane top coat over a cementitious base coat
- Approved Products:
- Spectrashield
- Cementitious base coat shall be Raven 705CA by Raven Lining Systems, Mainstay ML-72 by Madewell Products Corporation, or Engineer preapproved equal.
- Epoxy or polyurethane coating shall be Raven 405 by Raven Lining Systems, Mainstay DS-5 by Madewell Products Corporation, SprayWall by Sprayroq, S-301 Epoxy Spray System by Warren Environmental, Inc., Sauereisen SewerGard No. 210X, Dinjer SG Mastic by WBE Dorcas, Inc., or Engineer pre-approved equal
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624