Project: GLO SS Project 1 Sanitary Sewer Improvements

PM Construction & Rehab, LLC – ITB: M/W/SBE & Section 3 Certified Firms

Project: GLO SS Project 1 Sanitary Sewer Improvements

Project Location: Kingsville, TX

Bid Due Date: 04/09/2024

Quotes Returned: 04/04/2024

Scopes:

CCTV

  • Pre CCTV CIPP lines 6”-18”  of  7,477LF
  • Post CCTV open cut lines 6” – 24”  of 3,802LF

Manhole rehab

  • Manhole Protective Coating (60Mil)

Bypass

  • 6” sound attenuated diesel Pumps X 2 and layflat hose with Bauer fittings X 1000LF
  • Bypass plans

Traffic control

  • TX Dot double lane closures – up to 700 LF per.
  • Setups to be moved daily.
  • TX Dot traffic plans – engineered stamped

Open cut

  • Asphalt pavement
  • Concrete curb, ramp, sidewalk, driveway
  • Gravel Driveway Repair
  • Junction Box W/ Sanitary Sewer Crossing
  • Re-Grade Ditch Area
  • 4’Ø Fiberglass Sanitary Sewer Manhole
  • 12”Ø Steel Casing Bore ¼” Thickness W/Pipe Vent
  • 6”Ø Sanitary Sewer Line Pvc Sdr-26
  • 18”Ø Sanitary Sewer Line Pvc Sdr-26
  • 6”Ø Sanitary Sewer Force Main Line Pvc Dr-18 (C-900)
  • 12”Ø Sanitary Sewer Line Pvc Dr-18 (C900)
  • 24”Ø Rcp (Class V)
  • Lift Station Assembly
  • Generator (62.5 Kva) w/ Stand By Generator Concrete Pad
  • Steel Canopy Structure
  • Electrical System
  • Aep Power Pole Transformer

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624