PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: 2024 West Main Street Sewer Replacement

Inliner Solutions – ITB: M/S/WBE Certified Firms

Project: 2024 West Main Street Sewer Replacement

Project Location: Dothan, AL

Bid Due Date: 07/09/2024

Quotes Returned: 07/03/2024

Scopes:

  • Pre CIPP CCTV & Cleaning, San. Sewer (562998)
    • 8” & 10” Dia
    • Protruding lateral Removal
  • Lateral Rehabilitation (237110)
    • CIPP Lateral Lining
  • Open Cut Repairs (238910)
    • Cleanout Install
    • Stone Backfill Install
    • Manhole Install
    • Sanitary Sewer Removal & Replacement
    • Abandon Sewer
    • Service lateral removal and replacement
  • Asphalt & Concrete Restorations (237310)
  • Manhole Rehabilitation (237110)
    • 1. Strong Seal MS-2A, as manufactured by Strong Seal Systems.
    • 2. QM-1s Restore or Aluminaliner or GeoKrete as manufactured by Quadex, LLC.
    • 3. Permacast MS-10,000 or CR-5000 as manufactured by APM, Inc.
    • 4. Sewpercoat PG as manufactured by Kerneos, Inc., Chesapeake, Virginia.
    • 5. Mainstay ML-72 Restoration Mortar as manufactured by Madewell Products Corp.
    • 6. Substrate Surfacer No. F-121FBR as manufactured by Sauereisen.
    • 7. MSM as manufactured by AW Cook.

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624

Related Posts