PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

Project: Wastewater Collection System Rehabilitation and Renewal – 4259-28

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE firms

 

Project: Wastewater Collection System Rehabilitation and Renewal – 4259-28

Project Location: Houston, TX

Bid Due Date: 01/05/2023

Quotes Returned: 01/03/2023


Scopes: 

Clean/CCTV-6”-48” Gravity Sewers, Force mains & Siphons

Traffic Control- Flaggers, Lane Closures, Std. Signs & Cones.

Bypass- Pumps & Piping per the bid form

Static & Pneumatic Pipe Bursting

Material – 6”-18” HDPE Piping; Pre-cast Manholes

Slip-Lining

Grouting

  • Grouting for the annular space for the slip-lined mains
  • Chemical grouting of the manholes

Manhole Rehabilitation by 1” thick concrete liner-City of Houston Wastewater Approved Products List

Open Cut Work

  • Well Pointing/Dewatering System
  • Trench Safety System
  • Special excavation by hand
  • Obstruction Removal by Excavation
  • Remove & Replace Sanitary sewer mains
  • Point Repairs by excavation
  • Abandonment of point repairs
  • Slurry Boring
  • Service Reconnect by Excavation
  • Cement Stabilized Sand Backfill
  • Install Sanitary Sewer Cleanouts
  • Remove & Replace Air Release Valves
  • Adjust/Reset Manhole Frame & Cover
  • Raise Manhole to Grade
  • Install Air release valve manholes
  • Remove & Replace/ Install New Manholes/ Fiberglass Manholes
  • Remove & Replace Sidewalks/ Pavement/ Driveways/ Curb & Gutter/ Ramps
  • Milling & Overlay
  • Remove & Replace Trees

 


Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624