PM Construction & Rehab, LLC – ITB: DBE & SBE Certified Firms
Project: 2024 Sewer Pipe Bursting and Ancillary Infrastructure Improvements
Project Location: Lake Charles, LA
Bid Due Date: 06/04/2024
Quotes Returned: 05/30/2024
Scopes:
Aggregate (423320)
- #610 maintenance limestone 4,250 tons
Supply (326199)
- Fiberglass manholes- riser rings
- 8” & 15” HDPE DR 17 IPS w/ full circle clamps
- 6″ diameter SDR-26 PVC pipe, fittings, saddle tees, couplings, meter box, clean-outs.
Hydro Seeding (561730)
- 2,500 S.Y.
CCTV (562998)
- Pre-Clean & CCTV and Post CCTV of lines 8” & 15 “ sanitary sewer lines, 5,779 LF
Traffic control LA DOTD (561990)
- Single lane closures
- Street closures/ traffic diversions
- Junction closures
Paving (237310)
- Furnish and install 4 inch thick plain concrete pavement for sidewalks
- Furnish and install 6 inch thick reinforced concrete pavement for asphalt base, driveways – Type B
- Furnish and install 8 inch thick reinforced concrete pavement for roadways – Type B
- Furnish & install hot mix asphalt wearing course, 2 inch thick, incl. tack coat
Manhole rehab (237110)
- Install multi-layered interior coating for sewer manholes, Spectrashield, Triple Shield, or approved equal
Bypass (237110)
- Furnish and maintain whisper quiet temporary bypass pump, lines 8” & 15” sanitary sewer lines.
Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624