Project: FY2022 CDBG Sewerage System Improvements

Inliner Solutions – ITB: M/WBE & Section 3 Certified Firms

Project: FY2022 CDBG Sewerage System Improvements

Project Location: Glennville, GA

Bid Due Date: 09/21/2023

Quotes Returned: 09/18/2023

Scopes:

  • Pre CIPP CCTV & Cleaning , San. Sewer (562998)
    • Root & Grease Removal
    • Grit Removal
    • Protruding Tap Removal
  • Material Suppliers (326199)
    • PVC Pipe & Fittings
    • DI Pipe & Fittings
    • Precast Manholes
    • Manhole F&C
  • Open Cut Utility Repair (238910)
    • Point Repairs
    • Mainline Sewer removal & Replacement
    • External San. Sewer service reconnections
    • Cleanout Install
  • Manhole Rehabilitation (237110)
    • Manhole Rehabilitation Class C:
      • Brick and/or pre-cast manholes exhibiting serious corrosion in a harsh H2S environment will require the application of l “,100% calcium aluminate cementitious lining or micro silica lining. The lining shall be top coated with 100 mils of 100% solids epoxy as manufactured by Quadex, Inc., Madewell Products Corporation, Raven, Tnemec EpoxyTec or approved equal

Specs/Plans /Questions– Ashden Middlebrooks | [email protected] | 470-503-5624