PREMIER UNDERGROUND RENEWAL INFRASTRUCTURE SOLUTIONS

WSSC – Sewer Replacement/Rehabilitation IDIQ – Task Order No. 36 for Lower Anacostia Basin – Contract No. CI5335A17 / Project No. CICRLLLR6861C20

IPR Northeast, LLC – ITB: Certified MBE/WBE/SLBE Firms

Project: WSSC – Sewer Replacement/Rehabilitation IDIQ – Task Order No. 36 for Lower Anacostia Basin – Contract No. CI5335A17 / Project No. CICRLLLR6861C20

Project Location: Prince George’s County, Maryland

Bid Due Date: 11/16/2021

Quotes Returned: 11/11/2021 – 5:00 P.M. EST


Scopes Needed:

  • Pre-CIPP CCTV & Cleaning Sanitary Sewer
    • 8 – Inch Diameter
    • Trim Protruding Taps
  • Open Cut Utility Repairs
    • 8” Sanitary Sewer Pipe Bursting
    • 8” Sewer Main Replacement Open Cut
    • 4”& 6” Lateral Replacement Open Cut
    • Remove & Replace Manhole
    • Locate Buried Manhole
    • Manhole Grade Adjustment
    • Cleanout Install
  • Asphalt & Concrete
    • Asphalt Surface Restoration
    • Concrete surface Restoration
  • Lateral Rehab / Grouting
    • Lateral / Mainline interface grouting
    • Joint Defect Grouting
  • Manhole Rehabilitation
    • Cementitious
      • 334 VF
      • Approve Products :
        • Approved Manufacturers.
        • a. IPA systems, Inc.
          • 1) Octocrete (trowel).
          • 2) Drycon (brush or trowel) (Non-Structural Application only).
          • 3) Drycon SM (spray gun).
          • 4) Drycon SMF fiber reinforced.
        • b. The Strong Company, Inc.
          • 1) Strong-Seal MS-2A.
          • 2) Strong-Seal MS-2C (mild corrosion resistance).
          • 3) Strong-Seal High Performance (high corrosion resistance).
        • c. AP/M Permaform.
          • 1) Permacast MS-10,000 (corrosion resistant).
          • 2) Permacast MS-10,000 with Con-Shield (anti-bacterial additive).
          • 3) Permacast CR-9,000 (calcium aluminate cement) (trowel).
        • d. Sauereisen.
          • 1) F-120 Underlayment (calcium aluminate cement) (trowel).
          • 2) F-120 FC Fast Setting Underlayment.
          • 3) F-121 Substrate Resurfacer.
        • Or Equal.
    • Spray on Epoxy Liner
      • 31 VF
  • Landscaping
    • Shrub Replacement
    • Seed & Sod Grassing
    • Pruning
    • Tree Removal
  • Traffic Control
    • Single Lane Closure, 12 HR Shift

Specs/Plans /Questions– Takeesha White | [email protected] | 678-260-0545

Related Posts